Shoreline protection works in Das Island - United Arab Emirates

The north-west part of new flare extension on the north of Das Island, is now protected by COLRE-LOC™ units.
 

25.09, 52.52

The added value of CLI
CLI showed understanding of the Contractor’s needs. Problems solving mindset applied to this specific project..

Special features of the project

Das Island is the most important oil and gas operations hub in the United Arab Emirates. With almost 3 km2, it is a liquefaction, dehydration, and compression plant which has the capacity to produce around eight million tons of LNG, LPG, paraffinic naphtha, and sulphur.

Hydraulic conditions

Maximal depth : -8.54 m MSL
Structure length : 220 m
Top of the crest: + 6.5 m MSL
 

 

Construction aspect

Number of units : 1 100
Size of units : 5 m3

Structures built from the reclamation area. Around 1 100 CORE-LOC™ of 5 m3  were placed with a wire crane.

Owner
ADNOC LNG
Company
ARCHIRODON CONSTRUCTION (OVERSEAS) CO. LTD UAE
Designer
ARCHIRODON CONSTRUCTION (OVERSEAS) CO. LTD UAE
Date
2019 - 2019