Protection of the Chhara Port, India : an ACCROPODE™ II project

Protection of the Chhara Port - India

This major project has been undertaken by AFCONS INFRASTRUCTURE LIMITED as contractors on behalf of SIMAR PORT PRIVATE LIMITED from 2017. It consisted in the construction of a major 2250 m long breakwater. The breakwater is protected by ACCROPODE II™ armour units.

 

 

20.7206378, 70.6645014

The added value of CLI

CLI has provided a tailor-made assistance offering its remote and onsite services, with technical site visits for training and advising the contractor during the casting and placing phases. The expertise and performances of the CLI representatives have greatly facilitated the success of the works before and after the massive cyclone in 2023.

Special features of the project

The site was badly hit by a cyclone in 2023. Thanks to the dedicated efforts of SPPL teams and CLI specialist the construction of the breakwater and the repairs were conducted simultaneously.

Hydraulic conditions

  • Max. seabed depth (toe):  -9.0 m
  • Top of the crest: +11.00 m

Construction aspect

The Breakwater was constructed using a crane placed on the crest of the breakwater and another one on a barge from the sea. 

  • Total length of the ACCROPODE™ II block protection: 2250 m 

  • 8 m3 and 16 m ACCROPODE™ blocks  : 133 900 m³
Country
India
Owner
SIMAR PORT PRIVATE LIMITED (SPPL - Shapoorji Pallonji Group)
Company
AFCONS INFRASTRUCTURE LIMITED
Designer
COWI India
Date
2017 - 2024
Role of CLI
Sublicense contract and technical assistance for ACCROPODE™ II units