North Nurai Island project – UAE : an ACCROPODE™ I project

North Nurai Island project – UAE

The UAE presidential court has launched the construction project of the offshore island of North Nurai. This island project includes a 3 km long offshore breakwater. The armour of the structure is protected by  ACCROPODE™ I blocks of 2.5 m3.

24.6201242, 54.4743545

The added value of CLI

Understanding of the Contractor’s need. Problems solving mindset applied to this specific project.
Compliance Certificate delivered by CLI regarding the installation of blocks in accordance with the ACCROPODE™ I technique.

Special features of the project

CLI provided technical assistance and delivered a Compliance Certificate for the installation of the ACCROPODE™ I blocks on the structure.
The monitoring and verification of the installation is done using a 3D model of the armour made on the basis of Bathymetric and Photogrammetric surveys during the progress of the construction.

Hydraulic conditions

  • Length of the breakwater protected with ACCROPODE™ I blocks : 3.5 km

  • Max. seabed depth (toe): -9 m 

  • Top of the crest: +0.5 m 

Construction aspect

The breakwater was built from an offshore barge. 18 006 ACCROPODE™ I units of 2.5 m3 were placed using excavators on which Echoscope™ visualization system tools are installed.

Country
United Arab Emirates
Owner
Cour Présidentielle des Emirats Arabes Unis
Company
National Marine Dredging Company (NMDC)
Designer
ADEC Engineering Consultancy
Date
2023 - 2024
Role of CLI
Compliance Certificate
Sublicense contract and technical assistance for ACCROPODE™ units