North Nurai Island project – UAE : an ACCROPODE™ I project
North Nurai Island project – UAE
The UAE presidential court has launched the construction project of the offshore island of North Nurai. This island project includes a 3 km long offshore breakwater. The armour of the structure is protected by ACCROPODE™ I blocks of 2.5 m3.
Understanding of the Contractor’s need. Problems solving mindset applied to this specific project.
Compliance Certificate delivered by CLI regarding the installation of blocks in accordance with the ACCROPODE™ I technique.
Special features of the project
CLI provided technical assistance and delivered a Compliance Certificate for the installation of the ACCROPODE™ I blocks on the structure.
The monitoring and verification of the installation is done using a 3D model of the armour made on the basis of Bathymetric and Photogrammetric surveys during the progress of the construction.
Hydraulic conditions
Length of the breakwater protected with ACCROPODE™ I blocks : 3.5 km
Max. seabed depth (toe): -9 m
Top of the crest: +0.5 m
Construction aspect
The breakwater was built from an offshore barge. 18 006 ACCROPODE™ I units of 2.5 m3 were placed using excavators on which Echoscope™ visualization system tools are installed.
You have a question ?