The last ACCROPODE™ II block has been placed on the new breakwater at the TEMA LNG Import Terminal in Ghana
The last units were placed in October 2021. CHEC successfully used the same ACCROPODE™ II technology for the construction of the new TEMA port container terminal situated just 3km away. CLI ensured a thorough follow-up during fabrication and placement of the ACCROPODE™ II units along the new breakwater, which has led to an efficient relation with CHEC.