ACCROPODE™ technology used for the flagship Hong-Kong Airport third runway system project.
CLI has signed an agreement with the ZHEC-CCCC-CDC joint venture for the use of the ACCROPODE™ technology for seawall protection as part of the flagship Hong-Kong Airport third runway system project. The new runway is built entirely on a new reclaimed area in the Pearl River mouth and will be protected against waves by 2.0 m3 ACCROPODE™ blocks over a distance of nearly 4 km. This protection, aims to prevent cyclone waves and to dissipate the wave energy while keeping overtopping to a minimum to protect flight assistance equipment and commercial flight operations on the runway.