Llana beach réhabilitation

The LLana Beach Rehabilitation project includes the construction of two groynes to protect a sand beach in front of the Llana Beach Hotel on the west coast of Sal Island. The two groynes are rubble mound breakwater partially protected by ACCROPODE™ blocks.

16.614, -22.929

The added value of CLI

In this project, CLI was involved as the ACCROPODE™ technology provider. CLI provided technical assistance for the provision of the placing plans, advice on best practices. CLI also provided onsite technical assistance.

Hydraulic conditions

  • Water depth: -5 m
  • Length of the structure: 2 x 150 m
  • Crest level of the structure: +4 m

Construction aspect

  • Number of units: 1500
  • Size of units: 2m3
  • Slope : H4/V3
Country
Cape Verde
Owner
LLANA BEACH HOTEL de THE RESORT GROUP PLC
Company
CONSTRUCTORA SAN JOSE S.A
Designer
WW CONSULTORES DE HIDRAULICA E OBRAS MARITIMAS S.A.
Date
2015

You have a question ?

Specify your request ?

Category Quantity Shipping Return Back in stock Operations
- None -