Hong-Kong International Airport 3 Runway system, China : an ACCROPODE™ project

Hong-Kong International Airport 3 runway system project - China

Hong Kong Airport has expanded to accommodate the 3rd new runway as well as new infrastructure. The construction of a 13,000 meter-long sea wall with an ACCROPODE™ armour layer made of 0.8 m3 and 2 m³ ACCROPODE™ blocks, protects the 650 hectares of the new extension facing the sea.

photos ©CHEC

22.3002091, 113.924883

The added value of CLI

CLI developed a great understanding of the Contractor’s needs and applied a problem-solving mindset to this specific project.
The Compliance Certificate was delivered by CLI to attest that the installation of blocks is in accordance with the ACCROPODE™ I technique.

Special features of the project

CLI provided technical assistance and a Compliance Certificate for the installation of the ACCROPODE™ I blocks on the entire structure.
The monitoring and verification of the installation is done using a 3D model of the armour obtained on the basis of bathymetric and photogrammetric surveys during the construction.

 

Hydraulic Conditions

  • Max. seabed depth (toe):  -2.2m
  • Top of the crest: +6.80m
 

 

Construction Aspect

The breakwater was constructed using truss cranes from land.

  • Total length of the ACCROPODE™ II block protection: 13 000 m 
  • 0.8 m³ and 2 m³ ACCROPODE™ blocks  : 118 000 m³

 

Country
China
Owner
Airport Authority Hong-Kong
Company
ZHEC-CCCC-CDC
Designer
Atkins Limited
Date
2020 - 2022
Role of CLI
Compliance Certificate
Sublicense contract and technical assistance for ACCROPODE™ units