Construction of a new revetment for coastal protection against erosion in Foum El Oued, Morocco: an ACCROPODE™ II project

New revetment for coastal protection against erosion in Foum El Oued - Morocco

SOMAGEC SUD was awarded the contract to build a new revetment in the village of Foum El Oued, Morocco, by the "Ministère de L'équipement, du Transport, de la Logistique et de L’eau (Direction Provinciale de L'équipement, du Transport, de la Logistique et de l’eau de Laayoune)". The project consists of a 234 m-long structure, armoured with ACCROPODE™ II units, which will connect to two other segments of completed within a previous phase. The works have been executed in 2024.

27.1718775, -13.422859

The added value of CLI

CLI has provided a tailor-made assistance offering its remote and onsite services, with technical site visits for training and advising the contractor during the casting and placing phases. 

Special features of the project

An excavator was used to place units above and below the sea level. For the underwater placement, divers assisted the operator in order to ensure the correct placement of ACCROPODE™ units.

 

Hydraulic conditions 

  • Max. seabed depth (toe):  -2.69 m

  • Top of the crest: +6.68 m

  • Total length of the project:  234 m

Construction aspect 

  • Total length of the ACCROPODE™ II units protection: 234 m

  • Total volume of 1m3 ACCROPODE™ II units: 1 600 m³

Country
Morocco
Owner
Ministère de L'équipement, du Transport, de la Logistique et de L’eau.
Company
SOMAGEC SUD
Designer
TECTONE S.A.R.L.
Date
2024 - 2024
Role of CLI
Sublicense contract and technical assistance for ACCROPODE™ II units