Constanta beaches EFORIE North and TOMIS South

Dobrogea-seaside water administration has awarded the Contractor to re-build the several groynes located at Tomis south and Eforie north beaches at Constanta in Romania.

44.194, 28.662

The added value of CLI

In this project, CLI was involved as the ACCROPODE™ II technology provider and provided technical assistance with placing drawings, advice on best practices, and onsite technical assistance

Special features of the project

The units were placed using a hydraulic shovel which generates a high level of efficiency and fast placement. An appropriate selection of equipment, (hydraulic shovel, rotating hydraulic hook, ECHOSCOPE™), the support by a specialized/qualified divers’ team and focusing on CLI’s recommendations were beneficial to achieve the high performances and natural placement principles of the ACCROPODE™ II technology.

Hydraulic conditions

  • Design wave conditions: Hs 3.8m
  • Depth of the units -3.5m
  • Several structures : from 40m to 200m long
  • Crest level of the structure: from 3m to 4m

Construction aspect

  • Number of units: 3524
  • Size of units: 1 and 3m3
  • 8 to 10 rows in the slope Connection with STABILOPODS units at one groyne.
  • Connection with stones.
  • Concrete using cement plus Fiber
  • Use of ECHOSCOPE™ system for placing Armour units placed especially at the roundhead
Owner
Dobrogea-seaside water administration
Company
VAN OORD Dredging & Marine Contractors BV
Designer
VAN OORD Dredging & Marine Contractors BV
Date
2015
Role of CLI
Sublicense contract and technical assistance for ACCROPODE™ II units