 |
 |
References |
|
 |
 |
All projects
234 Gun Point harbour - Ragged Island Multipurpose harbour for a small island 300 kms southeast of Nassau. Two breakwaters of 300 m long armoured with CORELOC™ units
Country : Bahamas
Construction : 0 -
Type of block : CORELOC™
Block size used (m3) : 2.5
More details
|
233 Açu Commercial port at sao Jao da Barra, north of Rio do Janeiro. New port constructed offshore in 14 m waterdepth. L-shape breakwater, over 2 kms long protected with CORELOC™ units
Country : Brazil
Construction : 2010 - In progress
Type of block : CORELOC™
Block size used (m3) : 3.9 - 5
More details
|
232 Das Island Integrated Gas Development project Extension of the existing gas facilities on Das Island, off Abu Dhabi coast. The breakwater located in front of the northern quay wall is 400 m long and protected with CORELOC™ units of 2 greater sizes. 1.4 m3 units are used on adjacent protection
Country : UAE - Abu Dhabi
Construction : 2010 - In progress
Type of block : CORELOC™
Block size used (m3) : 1.4 - 5 - 1
More details
|
|
|
|